GRC构件的施工标准是怎样的?

来源:http://www.aswjc.com/ 发布人:admin 发布时间:2021-05-07

GRC构件线条就是指一种以耐碱玻璃纤维为提高材料。GRC装饰线条属于GRC建筑细部装饰构件中的一个常见构件类别。将工程建筑分开或在顶部做弧线,使外观更大气、豪华、美观。但是,GRC线和其他功能性建筑材料装饰对施工环境有一定的标准。下面,小编带你一起了解一下,希望能帮助到你!
GRC component line refers to a kind of alkali resistant glass fiber for improving material. GRC decorative line belongs to a common component category of GRC architectural detail decorative components. Separate the engineering buildings or make arc on the top to make the appearance more grand, luxurious and beautiful. However, GRC line and other functional building materials decoration have certain standards for the construction environment. Now, Xiaobian will take you to know about it, hoping to help you!
GRC装饰线施工标准:
GRC decoration line construction standard:
1.雨天不能施工。
1. Construction cannot be carried out in rainy days.
2、施工时要保持墙面基本干燥躁净。
2. Keep the wall dry and clean during construction.
3.在施工环境中风速较大的情况下
3. Under the condition of high wind speed in the construction environment
4.在强风和高温条件下,应在阳光直射的墙面上进行施工,以避免GRC施工中因缺水过快而出现发毛现象。
4. Under strong wind and high temperature conditions, the construction should be carried out on the wall in direct sunlight to avoid hairiness due to water shortage during GRC construction.
             济南GRC构件
5、施工墙面用2米水平尺检查,误差应小于4毫米;多余的零件应该修理
5. The construction wall should be checked with a 2m level, and the error should be less than 4mm; The spare parts should be repaired
6.施工现场环境温度和基墙表面温度在施工后24小时内不得低于5,一般在5-35进行施工。
6. The ambient temperature of the construction site and the surface temperature of the foundation wall shall not be lower than 5 within 24 hours after the construction, and the construction is generally carried out in 5-35 hours.
7、施工后为防止雨水侵蚀,应进行养护。
7. In order to prevent rain erosion after construction, maintenance should be carried out.
8.施工过程中,随时随地掌握天气变化,进行施工调整。恶劣天气禁止施工。
8. In the process of construction, the weather changes should be grasped anytime and anywhere, and the construction adjustment should be carried out. Construction is prohibited in bad weather.
9.在建GRC构件不允许进行其他施工。
9. No other construction is allowed for GRC members under construction.
10、应随时随地掌握未来三天的天气情况,以防雨天禁止施工。
10. The weather conditions of the next three days should be known at any time to prevent construction in rainy days.
感谢您的阅读,希望以上内容对您有所帮助,如您想了解更多精彩内容请点击我们的官网:济南GRC构件http://www.aswjc.com
Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: Jinan GRC component http://www.aswjc.com .