冬季北方已经过了一半,但是不少GRC构件厂家坚持冬季施工,施工要有温度保证,这样才能确保施工质量。那么冬季进行外墙装饰GRC构件的施工过程中,有哪些防冻的注意事项呢?下面济南GRC构件厂家为您讲解。
Half of the winter has passed in the north, but many GRC component manufacturers insist on winter construction, and the construction should have temperature assurance, so as to ensure the construction quality. So what are the precautions for frost prevention during the construction of GRC components for exterior wall decoration in winter? Next, the manufacturer of Jinan GRC components will explain it to you.
在安装之前,根据设计图纸将高程、水平线、直线和部件控制线铺设到外墙,使部件控制在同一水平。构造外框时,考虑设备的特点和外框的外框尺寸,以保证设备外框有一个令人满意的距离。
Before installation, the elevation, horizontal line, straight line and component control line shall be laid to the exterior wall according to the design drawings to control the components at the same level. When constructing the outer frame, consider the characteristics of the equipment and the outer frame size of the outer frame to ensure that the outer frame of the equipment has a satisfactory distance.
在误差大于5毫米时,接线装置应光滑、光滑。部件接头处应留有间隙,并按设计要求处理。防水部应做防水处理,并采取必要的防冻措施。显露于空气中的链节和焊接应该被可靠地腐蚀。
When the error is greater than 5mm, the wiring device shall be smooth and smooth. Gaps shall be reserved at the joints of components and treated according to the design requirements. Waterproof treatment shall be carried out for the waterproof part, and necessary anti freezing measures shall be taken. Chain links and welding exposed to air shall be reliably corroded.
固定桩锚节点的方法:外装修构件采用现浇混凝土结构,其实际强度等级大于C20,厚度大于1.5mm,厚度大于100mm。采用直径不小于8毫米的地脚螺栓。如伸缩螺栓不符合以上要求,应采用焊接连接装置。
Method of fixing pile anchor node: cast-in-place concrete structure is adopted for exterior decoration components, with actual strength grade greater than C20, thickness greater than 1.5mm and thickness greater than 100mm. It is recommended to use anchor bolts with a diameter of no less than 8mm. If the expansion bolt does not meet the above requirements, the welding connection device shall be used.
济南GRC构件
依据结构图确定外墙装饰件的安装位置为弹出式定位。翻转后粘贴网格布。如有特殊情况,不需旋转包装即可直接粘贴。采用薄层全粘方法粘贴,用力挤压各部位,使砂浆外溢,胶缝宽度不超过3mm。用钩子把胶缝固定住,灰缝要填满,零件表面要保持干净。
According to the structural drawing, the installation position of exterior wall trim is determined as pop-up positioning. Flip and paste the grid cloth. In case of special circumstances, it can be pasted directly without rotating the package. The thin layer full bonding method shall be adopted for pasting, and each part shall be forced to make the mortar overflow. The width of the glue joint shall not exceed 3mm. Fix the glue joint with a hook, fill the mortar joint, and keep the part surface clean.
安装时,如需拼接,应事先测量拼接的尺寸和角度。预接合应在平面上,接合位置不得超过3毫米。胶合砂浆作为粘接材料可提高砂浆的稠度,并可采用薄层全胶合的方法。接合时,需轻压均匀,锤打使灰缝符合要求。
During installation, if splicing is required, the size and angle of splicing shall be measured in advance. The pre jointing shall be on a flat surface and the jointing position shall not exceed 3 mm. As a bonding material, the bonding mortar can improve the consistency of mortar, and the thin layer full bonding method can be used. The joint shall be pressed gently and evenly, and the mortar joint shall meet the requirements by hammering.
以上讲解完毕了,相信大家已经对外墙装饰有了一个全新的认识,再提醒一点,装饰完工后,在外墙装饰构件的接缝干燥后,将专用的抗裂胶用于接缝处处理。当完成时,一定要注意保护成品,并严禁践踏和重物。关注我们http://www.aswjc.com,了解更多事项!
After the above explanation, we believe that you have a new understanding of the exterior wall decoration. One more thing to remind us is that after the decoration is completed, after the joints of the exterior wall decoration components are dry, special crack resistant adhesive will be used to treat the joints. When finished, pay attention to protect the finished products, and prohibit trampling and heavy objects. Follow us http://www.aswjc.com , learn more!